Installation

AC installation in Chennai

We size, supply and install air conditioning for offices, showrooms, restaurants, clinics and homes across Chennai — and then stay on the number for the years afterwards.

Site visit
Free in Chennai
Quote
Itemised, written
Fitters
In-house
Brands
9 supported

Most installation problems start before anything is bought. A tonnage picked off a rule of thumb, an outdoor unit put wherever there was space, a drain run with no fall. None of it shows up on the day of handover — it shows up in April, when the room will not hold and the unit is tripping.

So we start with the building. Heat load from the glazing and the lighting, how many people are in the room and when, what the electrical supply can take, where a condenser can sit and still breathe. That takes an hour on site and it decides the whole job.

After that it is ordinary careful work: equipment on site, piping and wiring run properly, drains with fall, units commissioned and balanced, and a drawing handed over that matches what is actually installed.

Where this applies

Offices and showrooms, restaurants and cafés, clinics and diagnostic centres, apartments and independent houses, and small manufacturing units.

Scope

What the work covers

This is what goes into the quote. If something on your job is not on this list, it will be written in rather than assumed.

01

Heat load and equipment selection

Room-by-room calculation rather than a floor-area guess, then a shortlist of equipment with the price difference between options set out plainly.

02

Copper, drainage and electricals

Refrigerant piping brazed and pressure tested, drains run with fall and trapped, and a dedicated circuit with the right breaker rather than a spur off whatever was nearby.

03

Outdoor unit siting

Clearances that let the condenser breathe, stands where airflow needs to get underneath, and a position that can actually be reached for service later.

04

Commissioning and handover

Charge checked, airflow balanced, controls proved, and a short walk-through with whoever is going to be operating the system.

Common questions

Questions we get asked

Do you charge for the site visit?

No. Anywhere inside Chennai the first visit and the quote are free. Further out we will still come, but we will tell you on the phone how long it takes us to get there so you know what a future breakdown call looks like.

How long does an installation take?

A single ductable unit in a ready space is usually a day or two. A full office floor with VRF is two to three weeks depending on how the ceiling and electrical work is running. We give you a sequence with the quote rather than a single end date.

Which brands do you install?

Daikin, Mitsubishi, Blue Star, Hitachi, Voltas, LG, Carrier, Panasonic and IFB. We are multi-brand dealers, so the equipment gets picked for the building rather than because it is the only thing we carry.

What happens after the warranty year?

Most customers move onto an annual maintenance contract, comprehensive or otherwise. You are not obliged to — plenty of people just ring us when something stops.

Tell us what needs cooling.

Send us the drawings, the tonnage, or just a photo of the plant room. We will come out, measure up and give you a written quote — no charge for the visit anywhere in Chennai.